Get StartedHelp & Guide

Machine Dashboard

Real-time overview of all manufacturing equipment and shift performance.

Active Machines
2 / 4

1 Down, 1 Idle

Overall Efficiency
76.4%

+2.1% from last shift

Shift Production
1,735

Units accepted today

Rejection Rate
2.5%

45 total rejected units

Production Output (Actual vs Target)
Overall Plant Efficiency (Today)
M-01
Injection Moulder A1
Running
OperatorJohn Doe
Current ProductPlastic Chair - Red
Production Target420 / 500 units
Efficiency95%
Uptime7h 15m
Downtime15m
Rejects5
M-02
Injection Moulder A2
Down
OperatorJane Smith
Current ProductPlastic Chair - Blue
Production Target120 / 500 units
Efficiency0%
Uptime2h 00m
Downtime4h 30m
Rejects12
Issue: Heater Band Failure - Awaiting Parts
M-03
Extruder B1
Idle
OperatorMike Johnson
Current ProductPVC Pipe 2"
Production Target1000 / 1000 units
Efficiency82%
Uptime6h 00m
Downtime0m
Rejects25
Note: Production run completed. Awaiting mold change.
M-04
Injection Moulder C1
Running
OperatorSarah Lee
Current ProductStorage Box L
Production Target195 / 300 units
Efficiency88%
Uptime5h 45m
Downtime45m
Rejects3