Active Machines
2 / 4
1 Down, 1 Idle
Overall Efficiency
76.4%
+2.1% from last shift
Shift Production
1,735
Units accepted today
Rejection Rate
2.5%
45 total rejected units
Production Output (Actual vs Target)
Overall Plant Efficiency (Today)
M-01
Injection Moulder A1
OperatorJohn Doe
Current ProductPlastic Chair - Red
Production Target420 / 500 units
Efficiency95%
Uptime7h 15m
Downtime15m
Rejects5
M-02
Injection Moulder A2
OperatorJane Smith
Current ProductPlastic Chair - Blue
Production Target120 / 500 units
Efficiency0%
Uptime2h 00m
Downtime4h 30m
Rejects12
Issue: Heater Band Failure - Awaiting Parts
M-03
Extruder B1
OperatorMike Johnson
Current ProductPVC Pipe 2"
Production Target1000 / 1000 units
Efficiency82%
Uptime6h 00m
Downtime0m
Rejects25
Note: Production run completed. Awaiting mold change.
M-04
Injection Moulder C1
OperatorSarah Lee
Current ProductStorage Box L
Production Target195 / 300 units
Efficiency88%
Uptime5h 45m
Downtime45m
Rejects3